BOQ Workspace
Services
Saved BOQs
Injection Grouting
CC BOQ • Site quantity and cost calculator
Project details
Project / BOQ reference
Location / Work area
Site measurement and technical inputs
Crack / joint length (m)
Consumption (kg/m)
Number of coats / passes
Wastage allowance (%)
Material rate (₹ per consumption unit)
Labour rate (₹/m)
Equipment and other fixed cost (₹)
Technical specification / TDS reference
Enter verified manufacturer TDS consumption and site-approved application details. The rate/consumption unit must match (kg, L, or m²). Membrane overlaps and pack rounding must be accounted for in the entered allowance. Taxes excluded.
Calculate BOQ
Print / PDF
Export CSV
Save BOQ (login required)
BOQ Summary
Net material
0
Material with allowance
0
Estimated total excluding GST
₹0